Power first. Parcels second.

Find power. Build in months.

Grid intelligence for data centers: where U.S. utilities say a megawatt or more of new load can connect, with the source behind every number.

A detailed terrain model with a winding river, transmission lines and a data center campus.

The question

Where can we energize at least X MW, how soon, and how do we know?

Why small pockets of power

The megawatts hyperscale walks past

Hyperscale leaves megawatts on the table

Hyperscale developers need a hundred megawatts or more in one place and pass over anything smaller. We think thousands of 1–20 MW pockets exist, and many can be energized in months rather than years.

The evidence is scattered

No public dataset answers the question. The evidence is split across utility capacity maps, transmission studies, load queues, economic-development listings and property records, and each source means something different by “capacity”.

A number never travels alone

Atlas keeps every megawatt figure attached to its definition, evidence level, source and date. Different kinds of evidence sit side by side and are never averaged into one number.

How it works

From published map to written answer

  1. Step 1

    Collect

    Every machine-readable utility load-capacity map we can find, the national grid — substations, transmission lines, power plants, service territories — and public load queues. Sources refresh on a schedule, and every snapshot is archived, so we see capacity change over time.

  2. Step 2

    Qualify

    Each value keeps what it measures: load hosting capacity, headroom, transmission withdrawal capacity, or a figure stated for a specific site. Ratings and peak loads are context and are never shown as available capacity.

  3. Step 3

    Locate

    We join that evidence to places we could build — retired plants, former industrial loads, brownfields and listed sites — and then ask the utility. Only a written answer counts as confirmed.

Evidence levels

Four kinds of evidence, never blended

A rating or a peak is never available capacity, and a modelled number is never presented as a utility’s. Every value in Atlas carries one of these levels, and the map says which.

A
Utility-confirmed for a specific site: a written response, completed study or service agreement.
The map says: Utility-confirmed, under stated assumptions.
B
Utility-published planning value: a hosting-capacity map, headroom table or utility-stated site capacity.
The map says: Utility-published screening value.
C
Modelled by us or a vendor from network data.
The map says: Modelled under a stated scenario.
D
Inferred from infrastructure: voltage, proximity, a retired plant, a former industrial load.
The map says: Candidate. Capacity unverified.

Work with us

Looking for power, or sitting on it?

Request access

Atlas is invite-only while we build it. Tell us what you are looking for and we will be in touch.

Offer a site

If you own or represent land or a building with a megawatt or more of spare capacity, we want to hear about it.

Utilities: if you publish capacity data and want to tell us how to read it, write to hello@findatlas.org.